Progress Bank

Fully Adhered 60 mil TPO Roof System

Low Sloped Roof Only: 1,430 square feet

  • Perform a pre-job meeting with a representative of the building owner to determine job site logistics/safety.

  • Obtain building permit as necessary.

  • Furnish and install required safety equipment per current OSHA and Blair Commercial Roofing Guidelines.

  • Load materials onto the roof via crane, distributing weight evenly. Cover until use.

  • Remove the existing roof down to the Gypsum Deck. Set aside copper materials for customers to recycle.

  • Furnish and install 1/2” Gypsum Fiber Primed Dens Deck Coverboard over the existing Gypsum Deck. Adhere this coverboard to the Gypsum Deck using adhesive per manufacturer specifications.

  • Furnish and install 60mil Thermoplastic Polyolefin (TPO). Fully adhere the new TPO to the newly installed coverboard using TPO bonding adhesive. TPO comes in White, Tan, or Gray colors.

  • Furnish and install TPO protective walk-pads around the old wooden roof hatch.

  • Flash all vent curbs and miscellaneous roof penetrations per manufacturer specifications.

  • Stacks & Pipes – All rooftop stacks and pipes will be field flashed per manufacturer specifications using TPO form flashing or be fitted with a prefabricated boot.

  • Furnish and install new 60mil TPO membrane at all walls and terminate under the existing copper counterflashing per manufacturer specifications.

  • Furnish and install two new 24-gauge TPO-coated metal scuppers per manufacturer specifications.

  • Clean up and dispose of all roof-related debris.

  • Furnish owner with a Twenty (20) Year GAF “No Dollar Limit” Warranty covering labor and material.

 

24 gauge, Kynar Finished, Standing Seam Metal Roof System

Steep Sloped Roof Only: 4,700 square feet

  • Perform a pre-job meeting with a representative of the building owner to determine job site logistics/safety.

  • Obtain building permit as necessary.

  • Furnish and install required safety equipment per current OSHA and Blair Commercial Roofing Guidelines.

  • Load materials onto the roof as needed on a day-to-day basis.

  • Set up a rooftop barricade along the gutter edge to prevent material from falling below.

  • Set up a sidewalk overhead protection along Highland Ave & 21st Place South sidewalks. One month rental.

  • Remove the existing roof and furring strips down to the Gypsum Deck.

  • Furnish and install new High-Temperature Ice and water Shield over the gypsum deck per specifications.

  • Furnish and install new 24 gauge, Kynar finished, standing seam metal roof panels per manufacturer specifications. The new roof will have a Loc Seam profile roof. The owner will pick a color from a standard color chart. If a premium color is chosen from the color chart, the manufacturer will charge more than this proposal cost.

  • Stacks & Pipes – All rooftop stacks and pipes will be flashed per manufacturer specifications.

  • Furnish and install new 16 oz copper guttering, where existing, per specifications.

  • Clean up and dispose of all roof-related debris.

  • Furnish owner with a Twenty (20) Year Material Warranty and five (5) Year Labor Warranty.

 

Low Sloped Roof Only: 1,430 square feet - 20-Year NDL Warranty

Steep Sloped Roof Only: 4,700 square feet - 20-Year Material Warranty & 5-Year Labor Warranty